Chevron Goes All in on Argentina

Chevron is bringing its expertise in shale extraction, as well as workers and equipment, to Argentina’s Vaca Muerta oilfield, where it hopes to pull off another shale boom (Reuters).
The goal: The company plans to expand from one drilling rig to three at its El Trapial block by early 2029. Chevron intends to spend $13.8 billion over 30 years to increase production in that area, one of its three projects in the Vaca Muerta formation.
- Last year, Chevron said it would triple its production in Argentina by 2035 to 195,000 barrels of oil equivalent per day. However, the addition of two new rigs by 2029 would help it reach that goal even sooner, a company executive said. El Trapial currently produces 40,000 boepd.
The big picture: The Vaca Muerta formation has never produced an oil boom like the Permian basin, in part due to Argentina’s tempestuous economy and politics.
- President Javier Milei, who swept to power on the promise of liberalizing markets, has enacted reforms that boosted production, setting Argentina up to become the third-largest liquids producer in South America by 2028, according to one research firm.
- “The country is expected to average 910,000 barrels of oil equivalent per day this year, a 42% increase from 2023 when Milei took office, according to Wood Mackenzie data.”
Chevron’s commitment: Chevron has operated in Argentina for more than a quarter century and has taken a stake in the planned Vaca Muerta Oil Sur export pipeline—a sign of the company’s confidence that the nascent oil boom will grow larger.
Cost pressures: Chevron has to contend with higher costs in Argentina, paying 30% more to bring a well online than in the Permian basin (although the Vaca Muerta formation is more productive, allowing it to recoup costs faster).
- Meanwhile, it has to transport sand for fracking by truck, hauling it 1,240 miles from north of Buenos Aires, because local sands have proved inadequate.
Bright hopes: Once a second rig arrives in June at El Trapial, fracking crews will be able to work continuously on site, as opposed to intermittently. Continuous drilling powered the shale boom in the Permian, and it will do the same for Vaca Muerta, said the executive.


